Monday, March 8, 2010

Formwork – Formwork 2 test

schpeal coming soon, in the interim mouse-over for details.

Assembling Fromwork2Bad Weld on through-bolt breaks during assembly   Rammign the first course Ramming the last course The master mason showing off the second lift Cracks showing up on the first lift beacuse of the soil being to dampThe finished surface of the first lift.

1 comment: