Wednesday, March 24, 2010

Construction – Layer Two

Ramming Layer two with Form3 and Form3.1 The cutout for the base of the bathroom window Ramming the window sill of bedroom 3Layer two of the walls is nearly there   The earth stockpile in the master bedroomThe second layer going up on the wall between  bedroom 3 and the kitchen Walking the big wall at the end of the livingroom

1 comment: