Tuesday, November 1, 2011

Outside render happening... last photos of our crazy rammed earth walls nakd

After nearly 12 months we have finally got round to rendering the outside of the house. While not strictly necessary, but it will easy some concerns about the possibility of long term damage to the windward wall, which receives quite a battering every wet season. As well as generally trim up the mess around each of the windows, which look a bit rough. It will alao improve relations with the neighbours, who i am sure are concerned as to why we haven't 'finished' our house.



Shower 2.0

Here is the new shower going into the hall bathroom, replacing the now defunct Brazilian-death-shower. After replacing the standard 2 handle faucets 3 times in 6 months we are switching over to brass shut-off valves for a bit of unbreakable industrial chic. A nice oversized low-flow rain showerhead, we will need this to minimize the drain on our tanks, as our water soon to be warmed by a lpg gas instant hotwater system.


Here comes the workshop!

A workshop for building furniture and general tinkering. We are building it up the top of the property adjacent to the road. At 4x6m It is a size that could be used for a single car garage or converted into a two room annex. But for my purposes, it will house two workbenches, a lathe and a shavehorse. The plan is to experiment with green woodworking techniques, to see what might be applicable to the local woods.



Tuesday, December 14, 2010

In with the glass!



-
Adam

Sunday, December 12, 2010

Plumbing - making gaskets

What do you do when the shower taps don't include the little rubber gaskets to fit the to the pipes? Break out the razor blades and the old car innertube! Custom fit every time.

-
Adam

Saturday, December 11, 2010

Tuesday, December 7, 2010

Fix for the double rolling door frame



-
Adam

Papyrus Ceiling Installation

In the final rush to get things done before we move in in two days, the ceiling is going up in the master bedroom.

-
Adam

Sunday, December 5, 2010

Trouble with the frame for the double roller door.

The frame for the large double roller door went up yesterday, but as the masons started to brick in the gap between the top and the roof, the section of free-span frame started to sag a little. It was only 1.5 cm over the whole distance of 450cm but it effected the angle of the tracks for the roller-doors. So we propped up the frame with branches until it was level, and now this morning, Joseph and I are working on some braces to connect the frame to the rafters, to help with the load of the bricks.

-
Adam

Saturday, December 4, 2010

Power Shower

We have a 3 phase instant hot water system for the house installed, but are waiting for the 3 phase lines to be brought up through our village. While we wait we want to be able to have hot showers, so we found this little shower head that heats the water as it passes through. We remain a little skeptical but, with a dedicated circuit breaker, our french-speaking electrician assures us that the 'electric douche' will be perfectly safe.

-
Adam

All four door frames are up!

With the countdown to move-in at only 5 days, we finally have all four door frames up in the living area. The masons are cementing and bricking them in at a furious rate.

-
Adam

Wednesday, December 1, 2010

Alcove for the flashlights...

This little alcove that is being built into the column that holds the light switches for the living area and porches. It is just inside the front door and so it the first place that you would realise that the power is out... Again. Thus the perfect place to put a flashlight.

-
Adam

Rolling door - minor setback

We had a minor setback when mounting the frame for the rolling door at the entrance of the house. This morning, after the cement had set over night we ran a test with the door. I turns out that the middle column had been set 2cm off center and the door rubbed. An easy fix but good thing we checked before the frame was bricked in place!

-
Adam

Tuesday, November 30, 2010

Putting up the frame for the single rolling glass door

Today the masons are installing the frame for the single large glass door that is the entrance for the house. In the second photo you can see the door that will hang in the frame being worked on in the background.

-
Adam

Monday, November 29, 2010

Papyrus Mats for Lining the Roof

Here we are testing the el-cheapo roof rack to the limits again. This time in an effort to buy enough papyrus mats to line the roof of the house.

-
Adam

Friday, November 26, 2010

Screen-Frame for the Big Porch goes up!

Today we started installing the metal frame that will support the insect-proof netting for the big porch.

-
Adam

Tuesday, November 23, 2010

Fixed frame for the glass door on the small entry porch

Joseph is attaching a piece of heavy duty angle to act as rail for the wheels of the door to run along. The small porch has only one large glass door as opposed to the double set on the large porch, so we are testing everything out on this one before adding the complexity of the extra door.

-
Adam

Basic Kitchen Layout takes shape

With the arrival of the last major appliance - our fridge - the kitchen starts to hint at its final shape. The basic layout is a large central prep/breakfast table bordered by an L-shaped counter running under the window and along the wall to the fridge. A semi-open storage wall will extend out from the wall beside the fridge, partly shelding the space from the dining area, without cutting it off completely. The storage-wall will contain all the cutlery, crockery glassware and serving items, all of which will be accessable from both sides of the wall to allow quick access for both loading clean dishes from the kitchen and setting the table from the dinning area.

-
Adam

Sunday, November 21, 2010

Buying the fridge in 4 dollar bills

LG makes a range of fridges designed espcially to deal with bad power, making them a great choice for us. So here I am paying for it in 2000 franc bills...

-
Adam